Obere Sill
Refurbishment
Technical data
- Location: Austria
- Year of construction: 1903
- Year of refurbishment: 2017
- Net head: 176 m
- Flow rate: 12,480 l/s
- Output per unit: 6,560 kW
- Total output: 19,680 kW
Scope of delivery: Renewal and repair of 3 twin Pelton turbines, the jet deflector including drive and the ball valve; replacement of the manifold, nozzle supply line, hydraulic units and piping; conversion to internally regulated nozzles.

Before vs. after
On the left side you can see the initial condition of the turbine before the revitalisation. On the right you can see a picture of the renewed and refurbished turbine.